Project goals, users, age groups, and capacity

Write down what the playground is for and who it serves. Settle the age groups (2–5, 5–12, or both), whether they need separate zones, and the number of children expected at one time at the busiest hour. These three answers drive equipment, surfaced area, and cost more than any product choice.

Site survey, property control, utilities, drainage, topography, access, and trees

Confirm who owns or controls the site and who must approve the work. Get a survey with dimensions and grades, locate underground utilities, and note overhead lines. Watch where water stands after rain. Check whether a delivery truck can reach the site and where materials can be staged. Identify trees to protect: their roots and canopies affect where equipment and footings can go.

Shade, supervision, adjacent hazards, and arrival routes

Note where shade falls through the day. Decide where supervisors will stand and keep sightlines open. Look at what borders the site: streets, parking, water, and drop-off lanes may call for fencing or separation. Plan how people arrive from parking, buildings, or sidewalks.

Accessibility

Plan an accessible route from the arrival point into the play area and to accessible play components, on surfaces that stay firm and stable. Decide early how far beyond minimum accessibility the project will go. See the accessibility guide.

Equipment selection, surfacing, fencing, and amenities

Shortlist equipment by age labels, play priorities, and capacity. Ask manufacturers or dealers for product-specific layouts with use zones shown. Choose a surfacing system tested for the equipment’s fall heights and one your team can maintain. Decide on shade, fencing, seating, and signage together, since they share space and budget. Compare surfacing options.

Permitting, funding, and procurement

Ask your local building or zoning office whether footings, shade structures, fences, or grading need permits. Confirm how the project will be funded and whether public procurement rules apply. Build a contingency into the budget and decide what gets cut if bids come in high.

Phasing and installation

If funds arrive in stages, design the full playground first and build the base, routes, and surfacing in a way later phases can join. Confirm installer qualifications, the installation window, and site safety during construction, especially on an occupied campus.

Inspection, maintenance, and documentation

Schedule a post-installation inspection before opening; a Certified Playground Safety Inspector may be appropriate. File manuals, warranties, surfacing test data, and installation records. Name who performs routine inspections and keeps the logs, and budget for replenishment and repairs. See safety standards and inspections.

Stakeholder questions

Administrators

  • What budget and approval path applies?
  • Who owns the playground after opening?

Teachers

  • How is recess scheduled and supervised?
  • Which age groups use it at the same time?

Parents

  • What do families see children wanting to do?
  • Are there access barriers today?

Children

  • What do you like to play? What is missing?
  • Where do you go when you want a break?

Facilities staff

  • Which surfaces can we realistically maintain?
  • Where are utilities, drainage problems, and delivery access?

Accessibility advocates

  • Can people reach and use the play areas from the arrival point?
  • What would make families stay longer?

Maintenance teams

  • Who inspects, how often, and with what records?
  • What replacement parts and top-up materials are needed?

Neighbors

  • Are there noise, lighting, parking, or hours concerns?
  • Will the playground be open to the community?

Donors

  • What recognition is appropriate?
  • What phase or feature would you most like to fund?

Printable planning checklist

Tick items as you go; the checkboxes are saved in this browser only. Nothing is sent anywhere, and no contact information is needed.

Goals and users
Site
Context
Design
Approvals and money
Build and after

Design My Playground · designmyplayground.com · Planning checklist, reviewed October 2026

Disclosure. Design My Playground is an independent planning resource, not a manufacturer, contractor, engineer, inspector, or certification body. Planning estimates are not bids, quotes, construction documents, or compliance determinations; qualified professionals and the selected manufacturer must confirm final products, layout, safety, accessibility, and pricing.